AI and GPU rack installation

Integrated AI racks are heavy, dense and expensive to get wrong. We plan the path, place and secure every rack, patch the fabric to your port map and document it all so your team can power on with confidence.

  • 450+ installs completed
  • US, Canada & Mexico Houston HQ
  • 1 business day written quote after complete scope

What's included

AI and GPU Rack Installation, scoped to your site.

Pre-arrival planning

Review of rack elevations, port maps and floor plans, plus the route from dock to row: doors, ramps, elevators and floor loading.

Receiving & inspection

Integrated racks received, checked against the packing list and inspected for shipping damage, recorded with photos.

Placement of heavy racks

Careful moves of high-density racks into position, leveled and secured to your site's specification.

Fabric patching

Fiber and copper patching to your port map, with dense cable dressing that keeps airflow and service access clear.

Labeling

Every cable labeled at both ends, every rack and device to your standard.

Pre-power walk-down & burn-in support

A walk-down against the plan with your team, photo documentation of every rack, and burn-in support on request.

How it works

From scope to handover.

  1. 01

    Scope

    Send the site, rack count, services and target date. Elevations, port maps or a BOM help.

  2. 02

    Quote

    Written quote within 1 business day of receiving your complete scope.

  3. 03

    Install

    A dedicated crew lead runs the job to the agreed plan and your site rules.

  4. 04

    Handover

    Walk-down, punch list and the documentation agreed in your quote.

Who it's for

Built for data center teams.

  • AI and GPU rack manufacturers and integrators
  • Colocation providers hosting AI deployments
  • Enterprises standing up GPU clusters
  • Logistics providers delivering integrated racks

OSHA-trained crews

Every field tech completes OSHA safety training before working on site.

Background-checked

Crew members are background-checked and drug-screened before site access.

Dedicated crew lead

One lead per job who owns the plan, the crew and the communication.

Quote in 1 business day

Written quote within 1 business day of receiving your complete scope.

FAQ

Common questions.

More answers on the main FAQ.

What should we send to scope an AI rack install?

Rack count and type, rack elevations, port maps, floor plans, the site location and your target date. Once we have your complete scope, you get a written quote within 1 business day.

Do you ship or transport the racks?

No. RackForce is install-only. You or your logistics provider get the racks to site, and we take them from the dock to the rack.

What documentation do we get?

Deliverables are agreed in your quote. Depending on scope, they can include a photo report, cable and port map, rack elevations, label schedule, serial and asset list, and a punch list with walk-down sign-off.

Request a Quote

Ready to scope the job?

Send the site, scope and timing. You get a written quote within 1 business day of receiving your complete scope.

Request a Quote
Call Request a Quote