AI and GPU rack installation
Integrated AI racks are heavy, dense and expensive to get wrong. We plan the path, place and secure every rack, patch the fabric to your port map and document it all so your team can power on with confidence.
- 450+ installs completed
- US, Canada & Mexico Houston HQ
- 1 business day written quote after complete scope
What's included
AI and GPU Rack Installation, scoped to your site.
Pre-arrival planning
Review of rack elevations, port maps and floor plans, plus the route from dock to row: doors, ramps, elevators and floor loading.
Receiving & inspection
Integrated racks received, checked against the packing list and inspected for shipping damage, recorded with photos.
Placement of heavy racks
Careful moves of high-density racks into position, leveled and secured to your site's specification.
Fabric patching
Fiber and copper patching to your port map, with dense cable dressing that keeps airflow and service access clear.
Labeling
Every cable labeled at both ends, every rack and device to your standard.
Pre-power walk-down & burn-in support
A walk-down against the plan with your team, photo documentation of every rack, and burn-in support on request.
How it works
From scope to handover.
- 01
Scope
Send the site, rack count, services and target date. Elevations, port maps or a BOM help.
- 02
Quote
Written quote within 1 business day of receiving your complete scope.
- 03
Install
A dedicated crew lead runs the job to the agreed plan and your site rules.
- 04
Handover
Walk-down, punch list and the documentation agreed in your quote.
Who it's for
Built for data center teams.
- AI and GPU rack manufacturers and integrators
- Colocation providers hosting AI deployments
- Enterprises standing up GPU clusters
- Logistics providers delivering integrated racks
OSHA-trained crews
Every field tech completes OSHA safety training before working on site.
Background-checked
Crew members are background-checked and drug-screened before site access.
Dedicated crew lead
One lead per job who owns the plan, the crew and the communication.
Quote in 1 business day
Written quote within 1 business day of receiving your complete scope.
What should we send to scope an AI rack install?
Rack count and type, rack elevations, port maps, floor plans, the site location and your target date. Once we have your complete scope, you get a written quote within 1 business day.
Do you ship or transport the racks?
No. RackForce is install-only. You or your logistics provider get the racks to site, and we take them from the dock to the rack.
What documentation do we get?
Deliverables are agreed in your quote. Depending on scope, they can include a photo report, cable and port map, rack elevations, label schedule, serial and asset list, and a punch list with walk-down sign-off.
Related services
Often booked together.
Rack and Stack
Server and network racks positioned, secured, populated and dressed by OSHA-trained crews, with every device and cable…
View serviceData Center Structured Cabling
Copper data, fiber and power-limited low-voltage cabling, routed, dressed and terminated to spec, then labeled and…
View serviceStaging, Receiving and Burn-In Support
Equipment received, inspected, reconciled and staged in install order, with burn-in support so it hits the floor ready…
View serviceRequest a Quote